Beverly Power Line Rd
ProjectBeverly Power Line Rd
Duration5 Months
LocationFlinders Ranges, SA
Sector
Services
Works included top soil stripping, clay subgrade formation and survey.
SCOPE OF WORKS
- Sub base construction – 230mm layer of base course rubble.
- Capping layer construction- 100mm layer of calcrete material.
- All design levels were controlled using our GPS machine control 12M Grader.
- Laying of 400m of RCBC, 250m of 600mm welded poly pipe
- Onsite crushing of 30,000 tonnes of calcrete material
- D9T Bulldozer used for raising rock; material was transported using road train side tippers
- This project was delivered on a 7 day a week program, operators and supervisors were rotated on a 2 on 2 off roster,
- Company aircraft was utilised for all shift change flights to and from site.