Buttrose Earthmovers were engaged for the task of constructing a new greenfield 5.6km GPS design haul road for Heathgate Resources.

Beverly Power Line Rd

ProjectBeverly Power Line Rd
Duration5 Months
LocationFlinders Ranges, SA
Sector
Services

Works included top soil stripping, clay subgrade formation and survey.

SCOPE OF WORKS

  • Sub base construction – 230mm layer of base course rubble.
  • Capping layer construction- 100mm layer of calcrete material.
  • All design levels were controlled using our GPS machine control 12M Grader.
  • Laying of 400m of RCBC, 250m of 600mm welded poly pipe
  • Onsite crushing of 30,000 tonnes of calcrete material
  • D9T Bulldozer used for raising rock; material was transported using road train side tippers
  • This project was delivered on a 7 day a week program, operators and supervisors were rotated on a 2 on 2 off roster,
  • Company aircraft was utilised for all shift change flights to and from site.