Heathgate Airstrip
ProjectHeathgate Airstrip
Duration10 Months
LocationBeverly Uranium Mine, SA
Sector
Services
The airstrip is an integral part of the structure of Heathgate’s organisation.
SCOPE OF WORKS
- 6000 tonnes of Calcrete was crushed and stockpiled on site in anticipation for the airstrip closure.
- Intensive 3 week occupation of the airstrip
- Material was conditioned and spread using multiple scrapers.
- Subgrade was tyned and conditioned before new calcrete layer was laid out. Compaction and surface finish was achieved using a mixture of multi tyre and smooth drum roller.
- 4Km of electrical trenching for electrical cable install