St Yves Stage 4&5

St Yves Stage 4&5

St Yves is an exclusive urban masterplan community located in Roseworthy, SA.

St Yves Stage 4&5

ProjectSt Yves Stage 4&5
Duration10 Months
LocationRoseworthy, SA
Sector
Services

Buttrose Earthmovers was engaged to complete Stages 4 & 5 of this development, as well as High St and Regent Way predominately to facilitate the development of the new school, oval and future stages.

The Greenhill St Yves development was a comprehensive subdivision plan which includes extensive site clearing and subgrade preparation across an area of 53,417m2.

SCOPE OF WORKS

  • Site clearing & topsoil strip
  • Bulk earthworks – cut to fill, including level 1 controlled fill
  • Subgrade preparation including subgrade stabilisation works
  • Extension of an existing stormwater basin
  • Road construction including pavements & asphalting
  • Concrete works including kerbing, spoon drains, concrete thresholds, driveways, roundabouts, median islands, pedestrian refuges, pram ramps
  • Installation of stormwater pipes, pits, swales & subsoil drains
  • Installation of sewer main, manholes, maintenance shafts, inspection openings, connections, etc
  • Installation of water main, fire plugs, stop valves, doglegs, connections, thrust blocks, etc
  • Common service trenching & backfill, and coordination of electrical, NBN and gas installation
  • Signage & line marking
  • Installation of irrigation conduits
  • Workforce peaked at 20 personnel achieving approximately 20,000 hours