St Yves Stage 4&5
ProjectSt Yves Stage 4&5
Duration10 Months
LocationRoseworthy, SA
Sector
Services
Buttrose Earthmovers was engaged to complete Stages 4 & 5 of this development, as well as High St and Regent Way predominately to facilitate the development of the new school, oval and future stages.
The Greenhill St Yves development was a comprehensive subdivision plan which includes extensive site clearing and subgrade preparation across an area of 53,417m2.
SCOPE OF WORKS
- Site clearing & topsoil strip
- Bulk earthworks – cut to fill, including level 1 controlled fill
- Subgrade preparation including subgrade stabilisation works
- Extension of an existing stormwater basin
- Road construction including pavements & asphalting
- Concrete works including kerbing, spoon drains, concrete thresholds, driveways, roundabouts, median islands, pedestrian refuges, pram ramps
- Installation of stormwater pipes, pits, swales & subsoil drains
- Installation of sewer main, manholes, maintenance shafts, inspection openings, connections, etc
- Installation of water main, fire plugs, stop valves, doglegs, connections, thrust blocks, etc
- Common service trenching & backfill, and coordination of electrical, NBN and gas installation
- Signage & line marking
- Installation of irrigation conduits
- Workforce peaked at 20 personnel achieving approximately 20,000 hours