Yellow Cake Pad
ProjectYellow Cake Pad
Duration5 Weeks
LocationBeverly Uranium Mine, SA
Sector
Services
Yellow cake is the raw uranium material produced by Heathgate at their processing facility adjacent to the new storage area.
SCOPE OF WORKS
- Condition material, place and compact and trim subgrade.
- Automatic GPS Grade control was used on this project due to the tight survey specs – Subgrade survey completed and passed.
Civil works included;
- Laying of 90m RCBC
- 130m of 600mm welded Poly Pipe
- Swale drain construction
- Geo fabric headwalls outlets covered with scour protection rock.
- Crushed and hauled 4,500 tonnes of Calcrete material from quarry 35km from site.
- Used GPS equipped 12M grader to complete final capping layer of Calcrete surface – As-con survey completed and passed.
